HD Sports Zone Employee Scheduling Builder
26A-25 — Final Approval Gate
This gate collects the final review acknowledgments for a future controlled one-row draft-save test.
It still does not write to the database, create a draft shift, publish a schedule, or send employee notifications.
FINAL APPROVAL GATE — STILL NO WRITE
Final Gate Review Form
Approval phrase:
SAVE_ONE_DRAFT_SHIFT
Rollback phrase:
ROLLBACK_ONE_DRAFT_SHIFT
This is a GET-only review gate. Passing this gate does not create a draft shift row and does not unlock a write route.
Approval Requirements
Approval phrase must exactly match SAVE_ONE_DRAFT_SHIFT.
Rollback phrase must exactly match ROLLBACK_ONE_DRAFT_SHIFT.
Target row count must be exactly one.
Target table confirmation must be acknowledged.
Dry-run payload validation must be acknowledged.
Rollback plan review must be acknowledged.
Target table inspection review must be acknowledged.
Publish disabled must be acknowledged.
Notifications disabled must be acknowledged.
Employee self-view disabled must be acknowledged.
Payroll, POS, reservations, payments, waivers, and customer data untouched must be acknowledged.
Manager initials must be present.
Final gate mode must remain no_write_review_only.
Gate Rules
The final approval gate is advisory/review-only.
Passing the gate does not run a write.
Passing the gate does not create a draft shift row.
Passing the gate does not unlock employee notifications.
Passing the gate does not publish a schedule.
Passing the gate does not create a rollback command.
A future write phase must still be explicitly approved before any database action.
A future write phase must remain one-row only and display the created row id immediately.
Safety Locks
No ENV changes.
No database writes.
No database deletes.
No migration creation or execution.
No real draft shift save.
No real rollback or cleanup command is installed.
No published schedule.
No employee self-view change.
No employee text message.
No employee email notification.
No payroll, POS, reservation, payment, waiver, or customer profile changes.
No hard conflict blocking.
No automatic scheduling.
No Payfast Office file, route, controller, or database action.
This phase uses GET-only review routes and does not unlock a write route.
Route Readiness
26A 25 final approval gate
Available
26A 25 final approval gate result
Available
26A 25 print packet
Available
26A 25 smoke test
Available
26A 24 target table confirmation
Available
26A 23 rollback plan
Available
26A 22 dry run validator
Available
26A 21 final pre write lock
Available
26A 20 review packet
Available
26A 19 capture shell
Available
Phase Trail
26A-22 — Complete / validation only
Controlled One-Row Draft Save Dry-Run Payload Validator
Validated the one-row payload and approval phrase without writing.
26A-23 — Complete / plan only
Controlled One-Row Draft Save Rollback Plan
Documented future cleanup boundaries and rollback phrase without creating or deleting anything.
26A-24 — Complete / schema inspection only
Controlled One-Row Draft Save Target Table Confirmation
Inspected candidate target tables and column groups without writing.
26A-25 — Current / final approval gate only
Controlled One-Row Draft Save Final Approval Gate / Still No Write
Captures final gate acknowledgments but still does not authorize or execute a database write.
Next Step Notes
Recommended next phase: 26A-26 — Controlled One-Row Draft Save Execution Preview Packet / Still No Write.
Do not run a real database write from 26A-25.
A future write phase must use a separate POST route and must remain one-row only.
A future write phase must display created row id, test token, rollback instructions, and affected row count.
Employee notifications and schedule publishing must remain disabled.