HD Sports Zone Bookmark 26A-7 — First Real Draft Shift Save Prep / Explicit Gate Still Required

Prep page for the future first real draft-shift insert. This phase still performs no database write. The explicit draft-save gate remains required before any real insert can happen.

Readiness: Ready for controlled first-write phase prep
Recommendation: A later phase may add the first actual insert, but only behind the explicit gate and with row-count verification.
Generated: Jun 5, 2026 12:14 AM
No database write was performed.

Gate

StatusLocked / disabled by default
ENV KeyHD_EMPLOYEE_SCHEDULE_DRAFT_SAVE_ENABLED
ENV Valuefalse
Note26A-7 is prep-only. The next real write phase must still explicitly check this gate before inserting.

Target Table

Tablehd_draft_shifts
ExistsYes
Rows5
ConfidenceHigh

Mapped Fields

Required mapped4
Required missing0
Optional mapped5
Target readyYes

Pre-Enable Checklist

ItemStatus
Target table detected Passed
All required columns mapped Passed
26A-5 no-op route verified Passed
26A-6 smoke test route available Passed
Draft save gate remains explicit Passed
No publish behavior attached to draft save Passed
No employee notifications attached to draft save Passed

Future First-Write Payload Plan — Not Saved

Logical FieldColumnSourceFuture ValueWrite Now?
employee_id employee_id validated request employee_id [validated value] No
shift_date work_date validated request shift_date [validated value] No
start_time starts_at validated request start_time [validated value] No
end_time ends_at validated request end_time [validated value] No
period_id schedule_period_id nullable validated request period_id [validated value] No
status status system value: draft draft No
role_position role nullable validated request role_position [validated value] No
created_by created_by current manager/user id when available [validated value] No
updated_by updated_by current manager/user id when available [validated value] No

Full Column Map

Logical FieldLabelRequiredColumnStatusFirst Write ActionWrite Now?
employee_id Employee Yes employee_id Mapped Future insert may include this field after explicit gate approval. No
shift_date Shift Date Yes work_date Mapped Future insert may include this field after explicit gate approval. No
start_time Start Time Yes starts_at Mapped Future insert may include this field after explicit gate approval. No
end_time End Time Yes ends_at Mapped Future insert may include this field after explicit gate approval. No
period_id Schedule Period No schedule_period_id Mapped Future insert may include this field after explicit gate approval. No
status Draft Status No status Mapped Future insert may include this field after explicit gate approval. No
role_position Role / Position No role Mapped Future insert may include this field after explicit gate approval. No
notes Notes No Not detected Optional Missing Skip optional field if still missing. No
created_by Created By No created_by Mapped Future insert may include this field after explicit gate approval. No
updated_by Updated By No updated_by Mapped Future insert may include this field after explicit gate approval. No

Rollback Plan

  • Keep HD_EMPLOYEE_SCHEDULE_DRAFT_SAVE_ENABLED=false until the first-write phase is intentionally approved.
  • If a future first-write phase fails, disable the gate immediately and clear Laravel caches.
  • Remove only the newest real-write route/controller from that future phase; do not delete schedule data tables.
  • Verify row counts before and after any future first-write test.
  • Keep draft save separate from publish and employee portal routes.
  • Do not add employee texts/emails until publish workflow is intentionally built later.

Safety Checks

Prep page is GET-only Passed 26A-7 does not submit or call a save route.
No insert/update/delete Passed Controller performs no database write statements.
No publish action Passed Employee-facing schedules are not changed.
No employee notifications Passed No text/email behavior is introduced.
Gate remains explicit Passed A future real-write phase must check HD_EMPLOYEE_SCHEDULE_DRAFT_SAVE_ENABLED.
No production override Passed Production route is checked separately.

Route Checks

ScreenStatusURIOpen
26A-7 First Write Prep Passed hd/employee-schedules/builder/draft-shift-first-write-prep Open
26A-6 Smoke Test Passed hd/employee-schedules/builder/draft-shift-save-smoke-test Open
26A-5 Gate-Protected Save Passed hd/employee-schedules/builder/draft-shift-gate-protected-save Open
26A-4 Implementation Plan Passed hd/employee-schedules/builder/draft-shift-implementation-plan Open
26A-3 Column Mapping Passed hd/employee-schedules/builder/draft-shift-column-mapping Open
26A-2 Validation Passed hd/employee-schedules/builder/draft-shift-validation Open
26A-1 Draft Save Gate Passed hd/employee-schedules/builder/draft-shift-save-gate Open
Production / Build Passed hd/employee-schedules/production Open

File Checks

FileStatusModified
26A-7 Controller
app/Http/Controllers/Hd/EmployeeSchedules/EmployeeScheduleDraftShiftFirstWritePrepController.php
Passed 2026-06-02 08:16:33
26A-7 View
resources/views/hd/employee_schedules/draft_shift_first_write_prep.blade.php
Passed 2026-06-02 08:58:53
26A-6 Controller
app/Http/Controllers/Hd/EmployeeSchedules/EmployeeScheduleDraftShiftSaveSmokeTestController.php
Passed 2026-06-02 08:09:29
26A-5 Controller
app/Http/Controllers/Hd/EmployeeSchedules/EmployeeScheduleDraftShiftGateProtectedSaveController.php
Passed 2026-06-02 07:43:45